Sims Solar

Sims Solar

We have roof mounted solar on our home, roof mounted solar on our barn, and a ground mount as well. We have battery back, and secure power outlets. Finally we have a Telsa Model S P100D, and the accompanying outlet.
Plainfield Public School District Solar Site

Plainfield Public School District Solar Site

ASP developed, designed, and built this PV system, consisting of arrays on 7 schools in the Plainfield Public School District. The PV systems were built using LONGi Solar modules mounted on ASP’s proprietary Solstice ballasted mounting system. SolarEdge inverters were...
PSE&G Highland Park Solar Site

PSE&G Highland Park Solar Site

ASP developed, designed, and built this project under PSE&G’s Solar-4-All Program. The project consists of a 604.8 kW DC ground system built on a closed landfill site belonging to the Borough of Highland Park. Also, incorporated is a Tesla PowerPack battery energy...
McGraw-Hill Solar Site

McGraw-Hill Solar Site

ASP developed, designed, and installed, this 14.1 MW PV system, one of the largest privately owned, net-metered photovoltaic system in the Western Hemisphere. The project is located on a greenfield in East Windsor Township, New Jersey. Originally scheduled for...
Caldwell Sewage Treatment Plant Solar Site

Caldwell Sewage Treatment Plant Solar Site

ASP developed, designed, and built this project under PSE&G’s Solar-4-All Grid Security Pilot Program. The project consists of a ground mount PV system and a EOS/Siemens Energy Storage System. The PV system provides power to the DPW directly to the PSE&G grid...

Pin It on Pinterest