CONTACT
ASES WEBSITE

NATIONAL SOLAR TOUR

NATIONAL SOLAR TOUR

SUSTAINABLE FEATURES COLOR KEY:

map color key
Loading Events

« All Events

Virtual Event Virtual Event

PSE&G Highland Park Solar Site

October 1 @ 12:00 am - 11:59 pm - January 15, 2023 @ 12:00 am - 11:59 pm

ASP developed, designed, and built this project under PSE&G’s Solar-4-All Program. The project consists of a 604.8 kW DC ground system built on a closed landfill site belonging to the Borough of Highland Park. Also, incorporated is a Tesla PowerPack battery energy storage system (“BESS”), comprised of a 560 kVA AC inverter and 2,088 kWh battery bank – a “4-hour” system using Li-ion battery technology. This solar plus battery hybrid energy supply allows PSE&G to provide ancillary and grid stabilization services via the ESS, which responds to commands from a network operations center operated by PSE&G and preprogrammed set points, and directs the inverter to charge, discharge or standby.

Details

Start:
October 1
End:
January 15, 2023
Event Category:
Event Tags:

Organizer

Lyle Rawlings
Email:
sales@advancedsolarproducts.com

Other

Sustainable Features
Battery Storage, Solar PV - Ground Mount
System Size (in kW):
604.8
Solar Site Type
Government Building
Organization:
Advanced Solar Products

Venue

Advanced Solar Products
Highland Park, NJ 08904 United States + Google Map

Pin It on Pinterest